My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0813 On-Call Amendment 1 - KVEC RV
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-0813 On-Call Amendment 1 - KVEC RV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:06:07 PM
Creation date
8/27/2026 12:05:23 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Amendment #1 with SCJ for the KVEC RV Park Project
Order
21
Placement
Consent Agenda
Row ID
148367
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />KVEC RV Park <br />August 13, 2026 <br />Page 4 of 9 <br /> <br />25 N Wenatchee Ave, Suite 238 Wenatchee, WA 98801 Office 509.886.3265 Fax 360.352.1509 scjalliance.com <br />Phase 7 100 Percent – Construction Documents <br />Task 1 Final Construction Plan Set <br />1) Updates to the overall plan set after the 90% design coordination meeting with the <br />County/City. This plan set will also be used as part of the construction bid set. <br />Phase 8 Stormwater Drainage Report <br />Task 1 Finalize Drainage Report <br />1) Update preliminary drainage report to match final design, which includes updates to the basin <br />map, sizing calculations, and report narrative. <br />Task 2 O&M Manual: <br />1) Prepare an operation and maintenance manual for stormwater components and BMPs (i.e. <br />catch basins, piping, etc.). The O&M manual will provide recommended maintenance <br />procedures, maintenance intervals, and describe conditions that warrant maintenance or <br />replacement of infrastructure. <br />Task 3 Construction Stormwater Pollution Prevention Plan (CSWPPP): <br />1) Prepare CSWPPP for submittal with Washington Department of Ecology General Stormwater <br />Construction Permit. <br />Phase 9 Cost Estimate <br />Task 1 90% Estimate: <br />1) Estimate of quantities and unit costs. <br />Task 2 100% Estimate: <br />1) Estimate of quantities and unit costs. <br />Phase 10 Specifications <br />Task 1 90% Specifications: <br />1) Development of specifications using the WSDOT Specifications for Road and Bridge <br />Construction as the basis of the project. <br />2) Development of project-specific and general special provisions for the project. <br />Task 2 100% Specifications: <br />1) Formatted to APWA and WSDOT Standard Specifications. Front-end contracting documents are <br />to be provided by the County.
The URL can be used to link to this page
Your browser does not support the video tag.