My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0813 On-Call Amendment 1 - KVEC RV
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-0813 On-Call Amendment 1 - KVEC RV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:06:07 PM
Creation date
8/27/2026 12:05:23 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Amendment #1 with SCJ for the KVEC RV Park Project
Order
21
Placement
Consent Agenda
Row ID
148367
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />KVEC RV Park <br />August 13, 2026 <br />Page 3 of 9 <br /> <br />25 N Wenatchee Ave, Suite 238 Wenatchee, WA 98801 Office 509.886.3265 Fax 360.352.1509 scjalliance.com <br />u) Irrigation Details <br />v) Traffic Control Plans <br />w) CXT Building Plans <br />Phase 4 Permitting <br />Task 1 Land Use - City of Ellensburg <br />1) SEPA Checklist: Develop the SEPA Checklist and reply to public comments. <br />2) Permit Application: Prepare City of Ellensburg Land Use Application. <br />3) Permit Submittal: Compile documents, including documents prepared by subconsultants, into a <br />single permit package and submit to City of Ellensburg. <br />4) Review Meeting: Meeting with the design team and client to review the City comments. <br />5) Comment Response Letter: Prepare comment response letter addressing City comments. <br />Task 2 Building Permit – City of Ellensburg <br />1) Building Permit Application <br />2) Building Permit Submittal: Coordination and document compilation of CXT pre-fab building <br />drawings for submittal to the City. <br />Task 3 Department of Ecology <br />1) Construction Stormwater General Permit: SCJ will assist the client with filing the notice of intent <br />with the Washington State Department of Ecology and transferring permit responsibility to the <br />contractor after one is selected. <br />2) UIC Registration: SCJ will help register the proposed UIC facilities online with Ecology, which <br />requires registration to be submitted 60 days prior to well construction. <br />Phase 5 Environmental Services (GG) <br />This Phase represents the remaining budget from the 2022 On-Call services. There is $7,109 of <br />remaining budget for GG to complete their scope of work that will be transferred to this <br />contract. <br />Phase 6 Cultural Resources <br />This phase represents the remaining budget for the remaining services from the 2022 On-Call <br />services contract. The remaining budget for these services is $14,163 and will be transferred to <br />this contract. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.