My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0813 On-Call Amendment 1 - KVEC RV
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-0813 On-Call Amendment 1 - KVEC RV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:06:07 PM
Creation date
8/27/2026 12:05:23 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Amendment #1 with SCJ for the KVEC RV Park Project
Order
21
Placement
Consent Agenda
Row ID
148367
Type
Agreement
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />KVEC RV Park <br />August 13, 2026 <br />Page 2 of 9 <br /> <br />25 N Wenatchee Ave, Suite 238 Wenatchee, WA 98801 Office 509.886.3265 Fax 360.352.1509 scjalliance.com <br />Phase 1 Project Management <br />Task 1 Project Management <br />1) General project communication <br />2) Monthly billing and contract administration <br />3) Subconsultant scoping (survey only) <br />Phase 2 Boundary Line Adjustment - Subconsultant Services <br />1) This phase includes subconsultant surveying services required to complete a Boundary Line <br />Adjustment, right-of-way vacation, preparation of easement documents, and legal descriptions <br />for the project. The fee associated with this task is based on the subconsultant’s direct cost <br />proposal; see attached. In addition, SCJ applies a 10% markup to subconsultant fees to account <br />for applicable taxes and administrative costs. <br />Phase 3 90 Percent - Construction Documents <br />This phase is to complete the documents into a permit-level plan set for processing by the City of Ellensburg. It <br />is assumed documents will be ready for submittal within 3 months. <br />Task 1 90 Percent Level <br />1) Boundary Line Adjustment Support – CADD incorporation <br />2) 90% Civil Plan Set: Plan set will include the following sheets; <br />a) Cover Sheet with General Notes <br />b) Existing Conditions <br />c) Demolition Plan <br />d) Temporary Erosion Control Plan and Details <br />e) Site Plan <br />f) Site and Paving Details <br />g) Overall Grading Plan <br />h) Detailed Grading Plans <br />i) Stormwater Plan and Profile <br />j) Stormwater Details <br />k) Overall Water and Sewer Plan <br />l) Water Plan and Profile <br />m) Water Details <br />n) Sewer Plan and Profile <br />o) Sewer Details <br />p) Gas and Electrical Plan <br />q) Gas and Electrical Details <br />r) Landscape Architecture Planting & Restoration Plans <br />s) Landscape Architecture Details <br />t) Irrigation Plans
The URL can be used to link to this page
Your browser does not support the video tag.