My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0818 Kittitas County 2026 On Call Initial Setup SCJ Alliance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-0818 Kittitas County 2026 On Call Initial Setup SCJ Alliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:58 PM
Creation date
8/27/2026 12:05:20 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve the SCJ Initial Set-Up for 2026 Contract Phase 3 - Upper Courthouse Sewer Project
Order
20
Placement
Consent Agenda
Row ID
148367
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Kittitas County On-Call <br />August 12, 2026 <br />Page 4 of 6 <br /> <br /> <br /> <br />25 N Wenatchee Ave, Suite 238 Wenatchee, WA 98801 Office 509.886.3265 Fax 360.352.1509 scjalliance.com <br />Task 4 Small Works Roster Solicitation <br />1) Support the County with utilization of their small works roster by responding to questions by <br />the Bidders. <br />2) Review the bid proposers and recommend an Award. <br />Task 5 Construction Administration <br />1) Office Engineering <br />♦ Documentation of prevailing wages <br />♦ Review subcontractor requests. <br />♦ Contractor schedule submittal review. <br />♦ Develop working day statements. Estimate 1 statements. <br />♦ Material submittal reviews. Estimate materials <br />♦ Monthly Pay Estimates <br />(a) Pay Estimate setup for the project. <br />(b) Review of field pay notes <br />(c) Pay Estimate review (office materials back check). <br />(d) Revisions based on Contractor responses. <br />(e) Requests to the contractor for additional information for payment. <br />(f) Estimate 1 pay estimate for the project duration. <br />♦ Request for Information (RFI’s) <br />(a) Setup tracking <br />(b) Review an estimate of 2 based on project size and complexity. <br />(c) Response to RFI’s. <br />♦ Change Order(s) <br />(a) Setup tracking <br />(b) Review or develop and RFP. <br />(c) Estimate 1 based on the size and complexity of the project. <br />Task 6 Construction Observation <br />1) Project field observation <br />♦ Estimate 2 onsite field observation days. <br />♦ Observing contractor’s compliance with contract documents <br />♦ Monitoring/inspection of traffic control <br />♦ Measuring items for payment. <br />♦ Site visit for punch list back review (1 trip onsite). <br />2) Finalizing of Inspection Daily Reports outside of inspection time. <br />3) Field quantity measurement preparation of pay note documents.
The URL can be used to link to this page
Your browser does not support the video tag.