My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sheriif Generator Replacement Proposal
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
Sheriif Generator Replacement Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:05 PM
Creation date
8/27/2026 12:04:41 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve On-Call Engineering Services with Hultz BHU for Project Task Order #1 - Sheriff's Office Generator
Order
18
Placement
Consent Agenda
Row ID
148367
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hultz/BHU Engineers (253) 383-3257 <br />Consulting Engineers <br />Project:Kittitas County <br />Work:Electrical Engineering Page: 1 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Site Visits 0.5 11 <br />Create Panels/One-Line 2 <br />Confirm Loads/Gen Adds 1 6 <br />Create ACAD Backgrounds 2 6 <br />Propane Sizing 0.5 4 <br />G#-Cover Sheet 2 2 <br />E#-Legend/General Notes 1 2 <br />E#-Site Plan 2 2 <br />E#-Power Plan(s) 0.5 8 8 <br />E#-Propane Tank/Piping 1 5 3 <br />E#-New Panel Schedules 4 2 <br />E#-New One Line 0.5 4 2 <br />Catalog Cuts & Revisions NIC <br />System Narratives NIC <br />Specifications - Technical 1 8 3 <br />Obtain Div 00 Docs--Format/Revise 0.5 2 <br />Coordination 4 <br />Schedule Review 1 <br />Meetings ` 3 <br />QC Review 2 1 1 <br />Progress Submittal(s) 0.5 1 1 1 <br />Cost Estimate(s) 1 8 <br />Permit Submittal 1 <br />Hour Total 9 0 0 80 0 0 0 29 4 <br />Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85 <br />Labor Cost Sub-Totals $2,250 $0 $0 $14,000 $0 $0 $0 $3,190 $340 <br />DESIGN PHASE TOTAL:$19,780 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Pre-Bid Meeting 5 <br />Substitution Request Review 1 <br />Bidder Questions 1 <br />Addenda 1 1 1 <br />Hour Total 1 0 0 8 0 0 0 0 1 <br />Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />Labor Cost Sub-Totals $250 $0 $0 $1,400 $0 $0 $0 $0 $85 <br />BID PHASE TOTAL:$1,735 <br />E N G I N E E R I N G H O U R S <br />DESIGN PHASE <br />BID PHASE <br />6/10/2026
The URL can be used to link to this page
Your browser does not support the video tag.