Laserfiche WebLink
Project:Kittitas County <br />Work:Electrical Engineering Page: 2 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Pre-Con Meeting 0.5 5 <br />Submittal Reviews 0.5 12 2 <br />Submittal Re-Reviews 2 <br />Correspondence Review 2 <br />Meetings (Virtual) 8 <br />Site Visits 6 <br />RFI's 0.5 2 1 <br />Changes/COP/CP Reviews 0.5 1 1 <br />Pay Reviews 2 <br />Punchlist 0.5 6 <br />Backcheck 5 <br />Closeout Review 2 1 <br />Hour Total 2.5 0 0 53 0 0 0 2 3 <br />Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />Labor Cost Sub-Totals $625 $0 $0 $9,275 $0 $0 $0 $220 $255 <br />CONSTRUCTION PHASE TOTAL:$10,375 <br />TOTAL ALL PHASES:$31,890 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />$250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />NIC = Not Included <br />Hourly Rates <br />CONSTRUCTION PHASE <br />6/10/2026