My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sheriif Generator Replacement Proposal
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
Sheriif Generator Replacement Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:05 PM
Creation date
8/27/2026 12:04:41 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve On-Call Engineering Services with Hultz BHU for Project Task Order #1 - Sheriff's Office Generator
Order
18
Placement
Consent Agenda
Row ID
148367
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:Kittitas County <br />Work:Electrical Engineering Page: 2 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Pre-Con Meeting 0.5 5 <br />Submittal Reviews 0.5 12 2 <br />Submittal Re-Reviews 2 <br />Correspondence Review 2 <br />Meetings (Virtual) 8 <br />Site Visits 6 <br />RFI's 0.5 2 1 <br />Changes/COP/CP Reviews 0.5 1 1 <br />Pay Reviews 2 <br />Punchlist 0.5 6 <br />Backcheck 5 <br />Closeout Review 2 1 <br />Hour Total 2.5 0 0 53 0 0 0 2 3 <br />Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />Labor Cost Sub-Totals $625 $0 $0 $9,275 $0 $0 $0 $220 $255 <br />CONSTRUCTION PHASE TOTAL:$10,375 <br />TOTAL ALL PHASES:$31,890 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />$250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />NIC = Not Included <br />Hourly Rates <br />CONSTRUCTION PHASE <br />6/10/2026
The URL can be used to link to this page
Your browser does not support the video tag.