Laserfiche WebLink
=1 r=. <br />TITAN <br />E L E C T R I C A L <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Ian Toms <br />Subcontractor Titan Electrical LLC <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />6/8/2026 <br />Change # <br />34 <br />Amount: <br />$63,125.15 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />CHANGE TITLE I Grinder Installation (Option A- VFD Cable) <br />THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: <br />Mill Motor Wiring <br />■ Option A. Provide Belden 29534 VFD cable per Vermeer Installation wiring recommendation <br />Clarifications <br />■ Steel frame required for cabinet mounting to be fabricated and installed by others. Dimensions <br />to be determined prior to installation <br />■ Setting and securing cabinet by others. Coordination with Titan will be required for feeder wire <br />routing <br />• Deviations from this scope and means/methods, commissioning of equipment, and alterations <br />requested by AHJ are not included <br />Cost Breakdown This Change: <br />Labor <br />$16,717.55 <br />Material <br />$35,886.74 <br />Other <br />O&P <br />$10,520.86 <br />Total <br />$63,125.15 <br />Page 1 of 2 <br />