Laserfiche WebLink
6/4/2026 2:20:20 PM Titan Electrical LLC Page 1 <br />Lower valley transfer station, (kittitas) : PCO 034- Grinder Wiring <br />Totals (Summary) - Bid Summary: Grinder Installation Breakout <br />Material <br />Non -Quoted <br />$24,055.88 <br />Quotes <br />0.00 <br />Sales Tax (0.00%) <br />0.00 <br />Total Material <br />$24,055.88 <br />Labor <br />Direct (373.88 hours @ $115,00) <br />$42,996.20 <br />Non -Productive Labor <br />0.00 <br />Total Labor (373.88 hours) <br />$42,996.20 <br />Direct Job Expenses <br />$0.00 <br />Tools and Miscellaneous Materials <br />0.00 <br />Subcontracts <br />0.00 <br />Job Subtotal (Prime Cost) <br />$67,052.08 <br />Overhead (10.00%) <br />6,705.21 <br />Profit (10.00%) <br />6,705.21 <br />Job Total <br />$80,462.50 <br />Actual Bid Price $80,462.50 <br />Material to Direct Labor ratio: 0.36 <br />Prime Cost per square foot <br />$0.00 <br />Job Total per square foot <br />$0.00 <br />Actual Bid Price per square It <br />$0.00 <br />Labor cost per square foot <br />$0.00 <br />Labor hours per square foot <br />0.00 <br />Gross Profit % <br />16.67 <br />Gross Profit $ <br />$13,410.42 <br />Net Profit % <br />8.33 <br />