Laserfiche WebLink
6/8/2026 11:22:04 AM Titan Electrical LLC Page I <br />Lower valley transfer station, (kiftitas) : PCO 034- Grinder Wiring <br />Totals (Summary) - Bid Summary: Mill Motor (VFD Cable Option) <br />Material <br />Non -Quoted <br />$35,886.74 <br />Quotes <br />0.00 <br />Sales Tax (0.00%) <br />0.00 <br />Total Material <br />$35,886.74 <br />Labor <br />Direct (145.37 hours @ $115.00) <br />$16,717.55 <br />Non -Productive Labor <br />0.00 <br />Total Labor (145.37 hours) <br />$16,717.55 <br />Direct Job Expenses <br />$0.00 <br />Tools and Miscellaneous Materials <br />0.00 <br />Subcontracts <br />0.00 <br />Job Subtotal (Prime Cost) <br />$52,604.29 <br />Overhead (10.00%) <br />5,260A3 <br />Profit (10.00%) <br />5,260.43 <br />Job Total <br />$63,125.15 <br />Actual Bid Price $63,125.15 <br />Material to Direct Labor ratio: 0.68 <br />Prime Cost per square foot <br />$0.00 <br />Job Total per square foot <br />$0.00 <br />Actual Bid Price per square It <br />$0.00 <br />Labor cost per square foot <br />$0.00 <br />Labor hours per square foot <br />0.00 <br />Gross Profit % <br />16.67 <br />Gross Profit $ <br />$10,520.86 <br />Net Profit % <br />8.33 <br />