Laserfiche WebLink
Docusign Envelope ID: 8FA23769-3978-8758-823D-68974425BAB6 <br />" " Document G70f - 2017 <br />, <br />Change Order <br />PROJECT: (\nnre and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />230076 Kittitas County Jail Facilities Contract For: Renovation Change Order \urnber: 013 <br />Renovation Task 1 <br />205 Test Sth Avenue Date: 04 30 2025 Date: 06-04-2026 <br />Ellensburg. NV A 9S926 <br />OWNER: ivame and address) ARCHITECT: (.\Tame and address) CONTRACTOR: 0-ante and address) <br />Kittitas County K\IT Belsaas &- Smith Construction, Inc. <br />2205 Rest 5th avenue 7S26 Leary Way KE -200 103 East 4th avenue. Ste: 209 <br />Ellensburg. WA 9S9_26 Redmond. W:-X 9S05- Ellensburg. W-A. 9S926 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(insert a derailed description of the change and, if applicable, arrach or reference specific eshlbits. AiSo include agreed upon <br />adfusnnents am•iburable ro ewcured C'onsnwcrion C'hangeDireen.ves,) <br />This chanize order includes a cost adjusuneut related to the added Sevvage Grinder Punrps work identified in COP-20 <br />The original Contract Sulu was S 2.457.000.00 <br />The net change by previously authorized Change Orders S 1.470.551.39 <br />The Contract Sum prior to this Change Order was S 3.927.55139 <br />The Contract Stun will be increased by this Change Order in the amount of S 96.16S.-3 <br />The new Contract Sum including this Change Order mill be S 4A23.71,20.12 <br />The Contract Time will be unchanged by Zero (0) days. <br />The nesv date of Substantial Completion will be <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maxinruru Price. or the Contract Time. <br />that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede The Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT; CONTRACTOR AND OWNER. <br />�3 <br />DocuSigned by: <br />" b,"VI --- <br />A( F11 I t� I (.Signature/ <br />BY: John :Anderson. Rk <br />(Prinred mante, ritle. crud license <br />number if required) <br />6/5/2026 <br />Dare <br />�Signed by: <br />s`°" L.�-lasgti� Pout �..,..�u- <br />C��c,�t�K�/57g)larttl'el __--- BY: Scott Carlson. Project Manager <br />(Prinred naive and rirle) <br />6/5/2026 <br />Dare <br />`-0WNER�/Signature) <br />BY: Patti Stacey. Facilities and�7aste <br />Operations Director <br />(Prinred name and rirle) <br />'L <br />Dare <br />A(A Document G701 — 2017. Copyright C- 1979, 1987. 2000, 2001 and 2017 All rights reserved. `The Amercan Institute of Architects ' -American Institute of <br />Architects - WA,- the AIA Logo, and -AIA Contract Documents` are trademarks of The American Institute of Architects This document was produced at 23:30:32 <br />PDT on 06)0412026 under Subscription No 20240090396 which expires on 1226 2026. is not for resale. is licensed for one-time use only. and may only be used <br />in accordance with the AiA Contract Documents' Terms of Service To report copyright violations, e-mail docinfo@aiacontracts.com <br />User Notes: (6a22096b583c877418e34a09) <br />