My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 8FA23769-3978-8758-823D-68974425BAB6 <br />BELSAA <br />8C <br />SMITH <br />BELSASC0330H <br />May 26, 2026 <br />Re: Sewage Grinder Pumps <br />P.O. BOX 926 / 700 EAST MOUNTAIN VIEW AVE, SUITE 504 <br />ELLENSBURG, WA 98926 <br />0:509-925-9747 C:619-278-8554 <br />scottc@belsmith.com <br />Per the description below, we are pleased to offer the following change order proposal #20 <br />(COP#20) Sewage Grinder Pumps. If approved, our team will move forward with the work as <br />follows: <br />• Sanitation of the sump and existing equipment <br />• Demolition and disposal of the existing sewage pumps, electrical, check valves and <br />associated piping to the isolation valves <br />a Mounting new grinder pumps on a steel plate to act as the sump floor <br />• Furnish, installation and startup of two new sewage grinder pumps, guiderails, floats <br />and associated piping and check valves connecting the existing isolation valves <br />• Installation of new electrical and control panel. <br />Total cost of proposal: $96,168.73 + WSST <br />Time extension required: 0 days <br />Sincerely, John Anderson, 6/4/26 <br />Scott Carlson <br />Belsaas & Smith Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.