My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 4C6E479E-20D0-BFDF-833C-020AE84A4B8C <br />ELI WE IUII]YIEW. <br />DANI CLAYTON PCCO #002 <br />Dent Clayton Project: 50597DC - 50597DC- Ellensburg, WA- Ellensburg Rodeo <br />1500 Bernheim Lane 1010 East 8th Avenue <br />Louisville, Kentucky 40210 Ellensburg, Washington 98926 <br />Phone: 502 634 3655 ext207 <br />Prime Contract Change Order #002: CE #004 - Foundation Fix <br />TO: Norpac FROM: Dant Clayton <br />1500 Bernheim Lane <br />Louisville, Kentucky 40210 <br />DATE CREATED 3/06/2026 CREATED BY: Sheela Fell! (Dant Clayton) <br />CONTRACT STATUS: <br />Draft <br />REVISION: <br />0 <br />REQUEST RECEIVED <br />LOCATION: <br />FROM: <br />DESIGNATED REVIEWER: <br />REVIEWED BY: <br />^ <br />DUE DATE: <br />REVIEW DATE: <br />INVOICED DATE: <br />PAID DATE: <br />REFERENCE: <br />CHANGE REASON: <br />Allowance <br />PAID IN FULL: <br />No <br />EXECUTED: <br />No <br />ACCOUNTING METHOD: <br />Amount Based <br />SCHEDULE IMPACT: <br />SIGNED CHANGE ORDER <br />REVISED SUBSTANTIAL <br />RECEIVED DATE: <br />COMPLETION DATE: <br />FIELD CHANGE: <br />No <br />CONTRACT FOR: <br />1:Ellensburg Rodeo <br />TOTAL AMOUNT: <br />$3,226.33 <br />DESCRIPTION: <br />CE #004 - Foundation Fix <br />The foundations In Ellensburg Rodeo were installed incorrectly. Instead of ripping out and having them redone, Dant design and engineered a solution <br />and sent materials to fix. <br />This change order is for the design, engineering, materials, and freight associated with fixing the piers. <br />ATTACHMENTS: <br />The original (Contract Sum) <br />Net change by previously authorized Change Orders <br />The contract sum prior to this Change Order was <br />The contract sum would be changed by this Change Order in the amount of $3,226.33 <br />The new contract sum including this Change Order will be <br />The contract time will not be changed by this Change Order, <br />SIGNATURE <br />DATE <br />Norpac Dant Clayton <br />1500 Bernheim Lane <br />Louisville, Kentucky 40210 <br />Sq-d by: r—s,gncd by: <br />Mob- baw ws 3/6/2026 1 11: 6 %I W FtW 3/6/2026 I 9 <br />SIGNATURE DATE SIG1A f3E' DATE <br />Dant Clayton Page 1 of 1 Printed On: 3/6/2026 09.45 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.