Kittitos County Lower Volley Tronsfer Station <br />September 3A,2A24 <br />Poge 2 <br />SCS will review and provide responses to an estimated 130 Request For lnformation (RFl) and <br />prepare an estimated 30 Design Change Notices. <br />Assumptlbns <br />t 147 Submittal Reviews (Estimated 2.5 hours persubmittal) <br />. Respond to 130 RFls (Estimated 4 hours per RFI)r Develop 30 Design Change Notices (Estimated 14 hours per DCN) <br />1 .3 Projecf Meeiings ond Speciolty lnspections <br />One SCS staff will participate in 30 - l--hour progress meetings remotely throughout the 15- month <br />project duration. <br />The SCS team will provide approximately 20 specialty inspections of project components throughout <br />the project duration. Each inspection will include 4-hours of onsite time and travel time from either <br />Seattle of Spokane. <br />Assumpfions <br />o Attendance of one SCS staff at 30 - 1-hour project meetings (remotely) <br />o 20 Specialty lnspections- 4-hours onsite <br />1.4 Geotechnicol Engineering Support <br />SCS's subconsultant will provide approximately 60 hours of engineering services providing the Owner <br />with support during construction on an as needed basis. <br />Assumptions <br />r 60 Hours of Geotechnical Engineering Support <br />I .5 As-Builts ond Project Closeout <br />SCS will prepare as-built drawings utilizing contractor provided markups. Four (4) SCS team staff will <br />participate in a substantial completion walkthrough and will provide the Owner with a final punch list <br />of items to be corrected by the contractor, <br />The number of asbuilt drawings to be prepared by discipline <br />r Civil 34o Architectural 59o Structural 27r MEP 46 <br />r Total l-66 Asbuilt Drawings <br />Assumptions <br />r Preparation of 1-66 As-Built Drawings