My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Document
>
Meetings
>
2025
>
06. June
>
2025-06-17 10:00 AM - Commissioners' Agenda
>
Fully Executed Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2026 10:38:40 AM
Creation date
6/29/2026 10:38:35 AM
Metadata
Fields
Template:
Meeting
Date
6/17/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize the Public Works Director to Sign a Task Order with Natural Waters LLC to Support Hydrology and Hydraulic Design of the Hungry Junction Widening Project
Order
9
Placement
Consent Agenda
Row ID
132242
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NATURAL WATERS <br />Hungry J unction lmprovement Proiect lune 4,2Q25 <br />lask 2.2 Hydrology <br />Natural Waters has reviewed the Reecer Creek FEMA reports and model provided by KCPW in <br />relation to the hydrology for Reecer Creek. The provided FEMA 2D hydraulic model only contains <br />the I%annual exceedance probability (AEP) (loo-year) flow. ln addition to the L% AEP (100-year) <br />flow, Natural Waters may need to determine the 50% AEP (2-year) flow to compare bankfull <br />widths measured by KCPW and WDFW. Other flows such as the O.2% AEP (500-yr)flow may also <br />be needed to support the water crossing design. Due to no gages on Reecer Creek, available <br />information from the FEMA 2D hydraulic model and reports, which utilized the USGS Regression <br />Equations, will need to be utilized. The FEMA 2D hydraulic model, which has a larger model <br />domain than the 2D hydraulic model developed for this project, will allow to determine the <br />associated flow at the Hungry Junction water crossing as not all water is conveyed through the <br />upstream Faust Rd crossing. Anecdotal information provided by County stafffrom previous high <br />flow events, if available, will also be utilized. <br />Assumptions: <br />o The FEMA 2D hydraulic model provided by KCPW only includes the L% AEP flow' The <br />FEMA 2D hydraulic model with other flows will be requested and utilized to determine <br />other flows necessary to support the design of the Hungry Junction water crossing' <br />o Up to 16 hours is available for Task 2.2. <br />Task 2.3 Rapid Geomorphic Assessment <br />Natural Waters will conduct a rapid geomorphic assessment of Reecer Creek in the project <br />vicinity using newly obtained survey information, geotechnical reports, aerial photos, and <br />findings from the field reconnaissance's. The purpose of this assessment is to determine if there <br />have been significant geomorphic changes over time which will need to be accounted for in the <br />design of the proposed water crossing and creek design. <br />Assumptions: <br />o A sediment transport model will not be developed. lt is assumed the proposed structure <br />will allow for natural sediment movement by following WDFW guidelines. <br />o The rapid geomorphic assessment for Reecer Creek will use available aerials and existing <br />reports to understand baseline channel migration. No quantitative analysis will be <br />conducted as part of the geomorphic assessment. <br />. Up to 4 hours is available for Task 2.3. <br />2lP age
The URL can be used to link to this page
Your browser does not support the video tag.