P.0, BOX 12973 | Olympia, WA 98508 1360'519.7251 <br />NATURI\L WATERS <br />Hungry Junction lmprovement Proiect <br />H&H Technical Assistance <br />Natural Waters Scope of Work <br />June 4, 2025 <br />Summary <br />Natural Waters has been requested by Kittitas County Public Works (KCPW)to provide hydrologic <br />and hydraulic (H&H) technical assistance to support the design and construction of the Hungry <br />Junction lmprovement project. The following describes the anticipated scope of work Natural <br />Waters will be assisting KCPW on for this task order. <br />Task 1. Project Management and Meetings <br />Natural Waters will participate in various meetings with the project team. Coordination and <br />project updates will happen throughout project. <br />Assumptions: Up to 16 hours is available for Task 1. This assumes work will occur between June <br />2025 and December 3t,2025. <br />Task 2. Geomorphology, Hydrology and Hydraulics <br />Natural Waters will perform the following geomorphology, hydrology and hydraulics tasks in <br />collaboration with the KCPW and Jacobs team. <br />Task 2.1 Field Reconnaissance's <br />Natural Waters will conduct field reconnaissance's with KCPW, Jacobs and WDFW staff to <br />examine th.e characteristics of the creek, various culverts, and surrounding riparian corridor with <br />respect to hydraulic, erosion, and scour processes. The purpose of the field reconnaissance's is <br />to understand site hydraulics and channel conditions, with an emphasis on determining an <br />appropriate structure span, creek alignment and potential scour countermeasures for the <br />proposed crossing. Field measurements will include characterizing sediment size, estimating <br />channel/floodplain roughness, assessment of existing scour protection, documenting evidence <br />of erosion, identification of high-water marks, and other relevant information to aid in the <br />assessment and design of the proposed Hungry Junction water crossing. <br />Assumptions: <br />. up to three site visits are budgeted to assess the project site. <br />o Up to 20 hours is available for Task 2.1.