My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between l2lll2025 and 311612026 <br />Date Foreman Cost Code Note Index Codes <br />02t25t2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 4 <br />Gompany Note: <br />lnspector Note: <br />0a26t2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 4 <br />Gompany Note: <br />Inspector Note: <br />02t27t2026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Backfilled the west half of the east restroom utility conduit runs with structural fill since the trench materiel was not suitable.17ftx35 ft <br />from top of footing height 1575.5 to subgrade 1576.92 <br />We had to remove out materiel across the whole building pad for all the conduits coming in All directions to the power utility room. <br />56.19 tns <br />33.06cy <br />Grid line 7 from grid line a to just north of grid line 6 <br />Across the western most slab from the west Ada ramp to across the west side of the west bathroom water service line <br />95fbx3 feet <br />1571.8 finish 1576 <br />3.5 feet to finish subgrade <br />62.81 tons <br />36.97cy <br />Attached lmages/Documents <br />indicates Selection Choice <br />Printed on:Page 7A Bolded Note lndex
The URL can be used to link to this page
Your browser does not support the video tag.