Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between L2lln025 and 311612026 <br />Date Foreman Cost Code Note Index Codes <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 3 <br />Gompany Note: <br />lnspector Note: <br />03t02t2026 2566 - DYLAN <br />03t09t2026 2566 - DYLAN <br />03fi612026 2566 - DYLAN <br />NOTE: <br />Filters in effect: <br />Dates >= 1210112025 and Dates <= 0311612026 <br />All Foremen. <br />Print : Working Conditions. <br />Print: Daily Diary Notes. <br />Print: Cost Code Notes. <br />All Note lndexes. <br />Cost Code = 98-021. <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Trench backfill in a hardscape area starting elevation of trench is 1573.5 built back up with 57 ft long 3.5 ft wide x4 ft 43.96 ton 25.86 <br />cy <br />East Ada ramp where the water runs under the side walk down grid line land k to grid line 1 and h <br />Grid line f and north of grid line 1 to west of grid line d and north of grid line 1 the slab on the northside of the bar building 35ftx3.5x3^5 <br />27tn 15.88cy <br />Total cubic yards is 41.74 <br />Total tns is70.96 <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />indicates Selection Choice <br />Printed on:lndex Code with Asterisks I