Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between l2lll2025 and 311612026 <br />Date Foreman Cost Code Note Index Codes <br />02t19t2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 5 <br />Company Note: <br />Inspector Note: <br />o2t20t2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 5 <br />Company Note: <br />lnspector Note: <br />02t23t2026 2566 - DYLAN <br />02t24t2026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />Adjusted elevation for pipe bedding to cover mainly 1- inch conduits as well as the footing edges were not backfilled since the <br />numerous electrical sleeves coming out of the cmu wall were on a separate cost code for footing backfill. <br />Compacted area <br />Attached lmages/Documents <br />Attached lmages/Documents <br />indicates Selection Choice <br />Printed on: 0U16/2026Note lndex Code with Asfer'sks