My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between l2/ll2025 and 311612026 <br />Date Foreman Cost Code Note Index Codes <br />02t12t2026 2566 - DYLAN <br />02t13t2026 2566 - DYLAN <br />02t1612026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Attached lmages/Documents <br />Attached lmages/Documents <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 8 <br />Gompany Note: <br />lnspector Note: Export of spoils pile for 109 feet of open excavation conduit bank <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 7 <br />Gompany Note: <br />lnspector Note: Export of unsuitable backfill materiel from the east building bathroom 109 feet of conduit trench <br />Attached lmages/Documents <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot 6 <br />Company Note: <br />Inspector Note: Excavate spoils out of east building utility closet sleeves that come underneath the footing and sweep up into the utility closet. <br />indicates Selection Choice <br />with Asterisks Prtnbd on:13:49:44 Page 5A Bolded Note lndex
The URL can be used to link to this page
Your browser does not support the video tag.