My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for atl Diary and/or Cost Code Note Entries between l2lll2025 and311612026 <br />Date Foreman Cost Code Note Index Codes <br />01t28t2026 9091 - NIC LOPEZ <br />Attached lmages/Documents <br />01t29t2026 2566 - DYLAN <br />Attached lmages/Documents <br />98-021 T&M: Trench Backfill Hardscape Areas <br />81.000 <br />Slot 5 <br />Gompany Note: <br />lnspector Note: <br />0a02t2026 2566 - DYLAN <br />02t03t2026 2566 - DYLAN <br />98-02'1 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot: 3 <br />Company Note: <br />lnspector Note <br />0210612026 9093 - RYAN PARTHEMER <br />02t0912026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Brought in materiel and placed structural fill in hard scape areas northside of the north build from the east side of the clean out <br />closest to the concessions building to the east <br />And the sewer run that runs parallel to the north side of the east building <br />Attached lmages/Documents <br />30 x5x3.5 ft conduit bank running down the center of the east building 4 4 in conduits built up in 3 lifts compacted with the heavy duty <br />diesel plate <br />Attached lmages/Documents <br />indicates Selection Choice <br />Asfen'sks Printed on:13:49:44 Page 4A Bolded Note Index
The URL can be used to link to this page
Your browser does not support the video tag.