Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between l2lll2025 znd 311612026 <br />Date Foreman Cost Code Note Index Codes <br />01t12t2026 2566 - DYLAN <br />01t13t2026 2566 - DYLAN <br />01t14t2026 2566 - DYLAN <br />01t15t2026 2566 - DYLAN <br />01t19t2026 2566 - DYLAN <br />01120t2026 2566 - DYLAN <br />01t2212026 2566 - DYLAN <br />01t26t2026 2566 - DYLAN <br />A Bolded Note Index <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Bear testing was on site testing concrete on this day so we went ahead and had them proof roll the north buildings first lift. I do <br />believe it is gonn be easing placing conduit on the 1.5 ft minus from finish and backfill the remainder of the buildSng after the <br />plumbing and elenctrical is installed <br />Attached lmages/Documents <br />indicates Selection Choice <br />Pinted on:6/2026 13:49:44 Page 3