Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries betwe en l2lll2025 and 311612026 <br />Date Foreman Cost Code Note Index Codes <br />12t18t2025 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />12t22t2025 2566 - DYLAN <br />12t30t2025 2566 - DYLAN <br />12t30t2025 9091 - NIC LOPEZ <br />12t31t2025 2566 - DYLAN <br />01t05t2026 2566 - DYLAN <br />01t06t2026 2566 - DYLAN <br />o1t07t2026 2566 - DYLAN <br />01t08t2026 2566 - DYLAN <br />Site was wet and rainy. Time dedicated to ensuring the site was protected. <br />Parker was 30 min late today said his alarm never went off. <br />We also called it a day at 1 pm due to the adverse weather we were gefting <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached Images/Documents <br />indicates Selection Choice <br />on: 03/16/2026 13:49:43Bolded Note Index Code with