Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-021 <br />Code Descrintion <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Reg. Hours OT Hours <br />Job Code: 2550-30 <br />Other Hours <br />Production Quantities: 0.000 <br />2533 WLLIAM GREEN <br />1D363 2012CAT 930H Loader <br />2533 WLLIAM GREEN <br />2541 PARKERBERMAN <br />8H354 2021Komalsu PC238 Exc <br />2541 PARKERBERMAN <br />1.00 <br />1.00 <br />2.OO <br />0.50 <br />2.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1.50 <br />0.00 <br />1.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />350 <br />210 <br />310 <br />210 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />6.0 <br />3.0 <br />Matl-Sub-Exp <br />2MFILL <br />Description <br />Fill Mateial Purchase & Deliv <br />CostType <br />M <br />Units Received <br />34.280 <br />Used <br />34.280TN <br />Gompany Note: <br />Inspector Note: <br />lndexes: <br />Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />Adjusted elevation for pipe bedding to cover mainly 1- inch conduits as well as the footing edges were- not bacKilled since the <br />numerous electrical sleeves coming out of the cmu wall were on a separate cost code for footing backfill. <br />Compacted area <br />Aftendancer/Non-Use Codes included in Hours: None / None <br />on: <br />Date: <br />B/16n026 <br />Page 7