Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Reg. Hours OT llours <br />Job Code: 2550-30 <br />Code <br />98-02L <br />Descrintion Other Hours <br />Production Quantities: 0.000 <br />2566 DYIAN BROWN <br />2582 RANDYRAMOS <br />2533 WLLIAM GREEN <br />LD363 2012CAT 930H Loader <br />2533 WLLIAM GREEN <br />2541 PARKERBERMAN <br />BH354 2021 Komatsu PC238 Exc <br />810 <br />210 <br />350 <br />1.00 <br />2.00 <br />1.50 <br />1.50 <br />0.50 <br />2.00 <br />2.OO <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />214 <br />310 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />7.0 <br />3-5 <br />Matl-Suh-Exp <br />2MFILL <br />Description <br />Fill Material Purchase & Deliv <br />CostType <br />M <br />Units Received <br />56.190 <br />Used <br />56.190TN <br />Gompany Note: <br />lnspector Note: <br />lndexes: <br />Backfilled the west half of the east restroom utility conduit runs with structural fill since the trench materiel was not suitable.17ftx35 ft <br />from top of footing height 1575.5 to subgrade 1576.92 <br />We had to remove out materiel across the whole building pad for allthe conduits coming in All directions to the po\,ver utili$ room. <br />56.19 tns <br />33.06cy <br />AttendanceNon-Use Codes included in Hours: None / None <br />Pdnted on: <br />Page I <br />Date: