Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-021 <br />Deserinfion <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Res. Hours 0T Hours Other Hours <br />Production Quantities: 0.000 <br />2582 RANDY RAMOS 210 <br />2533 WILLIAM GREEN 350 <br />1D363 2012CAT 930H Loader <br />2533 WLLIAM GREEN 310 <br />8H335 2015 Komatsu PC138 Exc(Yak) <br />2541 PARKER BERMAN 310 <br />RBH44O JOHN DEER MINI EXCAVATO <br />2.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />2.75 <br />2.75 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />6.7 <br />4.7 <br />Gompany Note: <br />lndexes: <br />lnspector Note: Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />Bn6n026 <br />Page 6Attendance/Non-Use Codes included in Hours: None/ None <br />Printed on:13:44:27 <br />Date: