My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />CIass Hours OT Hours Other Ifours <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />LD363 2012CAT 930H Loader <br />2347 ANTONIO SISCO <br />F8317 2023 DODGE RAM 35OO <br />2566 DYLAN BROWN <br />1136 JASONTORRESVARGAS <br />BH354 2O2l Komalsu PC238 Exc <br />1136 JASONTORRESVARGAS <br />350 <br />210 <br />810 <br />310 <br />210 <br />8.00 <br />8.00 <br />1.00 <br />9.50 <br />10.00 <br />5.00 <br />5.00 <br />4.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />28.0 <br />22,5 <br />Matl-Sub-Exp <br />2MCSBC <br />Description <br />Base Cr <br />Cost Type <br />M <br />Units Received <br />207.773 <br />Used <br />131.310TN <br />Company Note: <br />- lndexes: <br />lnspector Note: West building <br />We over excavated a7'x5'x4' <br />65'x4'x4.5 cont. <br />3 pad footings 4.6squared all threee were so close together we just excavated all 3 footings being so close together. 16.5' x 5.5'x4 <br />Middle dividing footing of the west building <br />32'x6'x4.5 <br />3 7x7 spread footings in the. Corral area <br />Bearing surface area is 1569.47 so we had to build back up with 1 foot of base course so excavating with concrete forms in mind met <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 7 <br />10:59:29 <br />Date:
The URL can be used to link to this page
Your browser does not support the video tag.