My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-00s <br />Descrintion <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Res. Hours OT llours <br />TN <br />Other Hours <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />LD363 2012CAT 930H Loader <br />F8317 2023 DODGE RAM 35OO <br />2566 DYIAN BROWN <br />1136 JASONTORRESVARGAS <br />BH3il 2021Komalsu PC238 Exc <br />1136 JASONTORRESVARGAS <br />350 5.00 <br />5.00 <br />5.00 <br />3.50 <br />3.25 <br />3.25 <br />4.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />15.7 <br />13.2 <br />810 <br />310 <br />210 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />Matl-Sub-Exp <br />2MCSBC <br />Description <br />Base Cr <br />Cost Type <br />M <br />Units Received <br />111.320 <br />Used <br />0.000IN <br />Company Note: <br />lnspector Note: <br />Indexes: <br />We finished 36 ft build up with base course at 4.5 ft wide with a 1.2 build on the northside of the west building all the way to the nw <br />corner <br />We then started over at the stadium pad footing with plinths on the northside side of the west staircase that pad was a 8x8 so we dug <br />out at a 9x9 we hit the load bearing surface atlSOS.OSS. And had to get a 3.345 build of base course on the 9x9 stadium pad we <br />also had the same build on the continues footing that went from that spread footing Down to the center of the west building <br />At 7 ft wide x. X4.095 <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Date: <br />0y052,026 <br />Page 6
The URL can be used to link to this page
Your browser does not support the video tag.