Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F TN <br />Class Res. Hours OT Hours <br />Job Code: 2550-30 <br />Code <br />98-005 <br />T)escrinfinn Other Hours <br />a 9'x9'x1' <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />1D363 2012CAT 930H Loader <br />2566 DYLAN BROWN <br />1136 JASONTORRESVARGAS <br />BH354 2021Komalsu PC238 Exc <br />1136 JASONTORRESVARGAS <br />2582 RANDY RAMOS <br />2545 JESUS LOPEZ <br />8H356 2021 Kubota Exc <br />2545 JESUS LOPEZ <br />350 <br />210 <br />810 <br />310 <br />210 <br />210 <br />310 <br />3.00 <br />3.00 <br />4.50 <br />3.00 <br />3.00 <br />4.00 <br />6.50 <br />5.50 <br />5.50 <br />1.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />27.5 <br />11.5 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />Gompany Note: <br />lndexes: <br />tnspector Note: Excavated 3 footings that are 7x7 a|1569.5 to build back up with 1 foot of base coarse the excavations where over dug for concrete <br />form boards at 9x9 <br />For the concours area for the f12 and l/ footing call outs The geo tech requested those footings be over excavated 2 feet with an <br />approved materiel. So being so low on grade anO to get the conect obvious of rock underneath the footing we are excavting footings <br />to build up rough between 10 inches we have 7 12x8 and27x7 finished <br />Attendance/Non-Use Codes included in Hours: None / None <br />Pinted on: <br />Page I <br />10:59:29 <br />Date: