My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F TN <br />Class Res. Hours OT Hours <br />Job Code: 2550-30 <br />Code <br />98-005 <br />T)escrinfinn Other Hours <br />a 9'x9'x1' <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />1D363 2012CAT 930H Loader <br />2566 DYLAN BROWN <br />1136 JASONTORRESVARGAS <br />BH354 2021Komalsu PC238 Exc <br />1136 JASONTORRESVARGAS <br />2582 RANDY RAMOS <br />2545 JESUS LOPEZ <br />8H356 2021 Kubota Exc <br />2545 JESUS LOPEZ <br />350 <br />210 <br />810 <br />310 <br />210 <br />210 <br />310 <br />3.00 <br />3.00 <br />4.50 <br />3.00 <br />3.00 <br />4.00 <br />6.50 <br />5.50 <br />5.50 <br />1.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />27.5 <br />11.5 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />Gompany Note: <br />lndexes: <br />tnspector Note: Excavated 3 footings that are 7x7 a|1569.5 to build back up with 1 foot of base coarse the excavations where over dug for concrete <br />form boards at 9x9 <br />For the concours area for the f12 and l/ footing call outs The geo tech requested those footings be over excavated 2 feet with an <br />approved materiel. So being so low on grade anO to get the conect obvious of rock underneath the footing we are excavting footings <br />to build up rough between 10 inches we have 7 12x8 and27x7 finished <br />Attendance/Non-Use Codes included in Hours: None / None <br />Pinted on: <br />Page I <br />10:59:29 <br />Date:
The URL can be used to link to this page
Your browser does not support the video tag.