Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:27 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 7 <br />Date: 02/20/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2533 WILLIAM GREEN 350 1.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 1.00 0.00 0.00 <br />2533 WILLIAM GREEN 210 2.00 0.00 0.00 <br />2541 PARKER BERMAN 310 0.50 1.50 0.00 <br />BH354 2021 Komatsu PC238 Exc 2.00 0.00 0.00 <br />2541 PARKER BERMAN 210 0.00 1.00 0.00 <br />Labor Totals: Hours - 6.0 <br />Equip Totals: Hours - 3.0 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MFILL Fill Material Purchase & Deliv M TN 34.280 34.280 <br />Cost Code Notes: <br />Slot:5 <br />Company Note: <br />Indexes: <br />Inspector Note:Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />Adjusted elevation for pipe bedding to cover mainly 1- inch conduits as well as the footing edges were not backfilled since the <br />numerous electrical sleeves coming out of the cmu wall were on a separate cost code for footing backfill. <br /> Compacted area