Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:27 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 6 <br />Date: 02/19/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2582 RANDY RAMOS 210 2.00 0.00 0.00 <br />2533 WILLIAM GREEN 350 1.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 1.00 0.00 0.00 <br />2533 WILLIAM GREEN 310 1.00 0.00 0.00 <br />BH335 2015 Komatsu PC138 Exc(Yak) 1.00 0.00 0.00 <br />2541 PARKER BERMAN 310 2.75 0.00 0.00 <br />RBH440 JOHN DEER MINI EXCAVATO 2.75 0.00 0.00 <br />Labor Totals: Hours - 6.7 <br />Equip Totals: Hours - 4.7 <br />Cost Code Notes: <br />Slot:5 <br />Company Note: <br />Indexes: <br />Inspector Note:Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83