Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:27 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 8 <br />Date: 02/25/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 1.00 0.00 0.00 <br />2582 RANDY RAMOS 210 2.00 0.00 0.00 <br />2533 WILLIAM GREEN 350 1.50 0.00 0.00 <br />LD363 2012 CAT 930H Loader 1.50 0.00 0.00 <br />2533 WILLIAM GREEN 210 0.50 0.00 0.00 <br />2541 PARKER BERMAN 310 2.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 2.00 0.00 0.00 <br />Labor Totals: Hours - 7.0 <br />Equip Totals: Hours - 3.5 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MFILL Fill Material Purchase & Deliv M TN 56.190 56.190 <br />Cost Code Notes: <br />Slot:4 <br />Company Note: <br />Indexes: <br />Inspector Note:Backfilled the west half of the east restroom utility conduit runs with structural fill since the trench materiel was not suitable.17ftx35 ft <br />from top of footing height 1575.5 to subgrade 1576.92 <br />We had to remove out materiel across the whole building pad for all the conduits coming in All directions to the power utility room. <br />56.19 tns <br />33.06cy