Laserfiche WebLink
Date Item Number <br />3/1/2026 <br />Reg. O.T. <br />1 12.5 $102.61 $102.61 $1,282.63 <br />2 9.50 $102.61 $102.61 $974.80 <br />3 8.00 $100.07 $100.07 $800.56 <br />4 $0.00 <br />5 $0.00 <br />6 3.0 $100.07 $100.07 $300.21 <br />7 6.0 $100.07 $100.07 $600.42 <br />8 $0.00 <br />9 3.0 $66.07 $66.07 $198.21 <br />10 3.0 $66.07 $66.07 $198.21 <br />11 $0.00 <br />12 $0.00 <br />15% Markup <br />13 3.00 $137.12 $411.36 <br />14 6.5 $124.46 $808.99 <br />15 20.5 $84.33 $1,728.77 <br />16 $56.10 $0.00 <br />17 $140.10 $0.00 <br />18 $25.32 $0.00 <br />19 9.5 $43.80 $416.10 <br />20 12.5 $47.22 $590.25 <br />15% Markup <br />21 94.13 TN $11.00 $1,035.43 <br />22 $0.00 <br />23 $0.00 <br />24 $0.00 <br />25 $0.00 <br />26 $0.00 <br />27 $0.00 <br />28 $0.00 <br />29 $0.00 <br />15% Markup <br />Date Checked By Date <br />$1,035.43 <br />$155.31 <br />Materials Total $1,190.74 <br />Calculated By <br />Total $10,747.81 <br />Materials Subtotal <br />Materials <br />Str. Fill <br />1-Ton <br />Equipment Subtotal $3,955.47 <br />$593.32 <br />Equipment Total $4,548.78 <br />D6 Dozer <br />Roller <br />Pickup <br />138 Excavator <br />Loader <br />Mini Excavator <br />$4,355.03 <br />$653.25 <br />Labor Total $5,008.28 <br />Equipment <br />238 Excavator <br />Labor Subtotal <br />Ramiro Ramirez Pipe Layer <br />Randy Ramos Pipe Layer <br />Jacob Nemec Operator <br />Tucker Slabach Operator <br />Labor <br />Dylan Brown Foreman <br />Jason Torres Operator <br />Levi Shinners Foreman <br />Time Worked Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />Footing Excavation & Structural Fill (March 2026) <br />Daily Report of Force Account Worked <br />Contract Number Item Name <br />Footing Subexcavation & Structural Fill