Laserfiche WebLink
Date Item Number <br />2/1/2026 <br />Reg. O.T. <br />1 47.0 $102.61 $102.61 $4,822.67 <br />2 3.00 $100.07 $100.07 $300.21 <br />3 9.0 $100.07 $100.07 $900.63 <br />4 26.5 $100.07 $100.07 $2,651.86 <br />5 16.0 $100.07 $100.07 $1,601.12 <br />6 $100.07 $100.07 $0.00 <br />7 $94.82 $94.82 $0.00 <br />8 $66.07 $66.07 $0.00 <br />9 49.5 $66.07 $66.07 $3,270.47 <br />10 $62.45 $62.45 $0.00 <br />11 $0.00 <br />15% Markup <br />12 11.00 $137.12 $1,508.32 <br />13 33.0 $124.46 $4,107.18 <br />14 41.5 $84.33 $3,499.70 <br />15 4.0 $56.10 $224.40 <br />16 6.0 $140.10 $840.60 <br />17 7.0 $25.32 $177.24 <br />18 47.0 $43.80 $2,058.60 <br />19 26.5 $47.22 $1,251.33 <br />15% Markup <br />20 $0.00 <br />21 1,252.92 TN $11.00 $13,782.12 <br />22 1 LS $1,179.72 $1,179.72 <br />23 3 HR $170.00 $510.00 <br />24 $0.00 <br />25 $0.00 <br />26 $0.00 <br />27 $0.00 <br />28 $0.00 <br />15% Markup <br />Date Checked By Date <br />Daily Report of Force Account Worked <br />Contract Number Item Name <br />Footing Subexcavation & Structural Fill <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />Footing Excavation & Structural Fill (February 2026) <br />Time Worked Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Labor <br />Dylan Brown Foreman <br />Parker Berman Operator <br />Ramiro Ramirez Operator <br />Will Green Operator <br />Jacob Nemec Operator <br />Jesus Lopez Operator <br />Operator (Roller) <br />Pipe Layer <br />Randy Ramos Pipe Layer <br />General Laborer <br />Labor Subtotal $13,546.95 <br />$2,032.04 <br />Labor Total $15,578.99 <br />Equipment <br />238 Excavator <br />138 Excavator <br />Loader <br />Mini Excavator <br />D6 Dozer <br />Roller <br />Pickup <br />1-Ton <br />Equipment Subtotal $13,667.37 <br />$2,050.10 <br />Equipment Total $15,717.47 <br />Materials <br />Str. Fill <br />Geotextile Fabric <br />Export Spoils Trucking (Thayer 2/12/26) <br />Materials Subtotal $15,471.84 <br />$2,320.78 <br />Materials Total $17,792.62 <br />Calculated By <br />Total $49,089.08