Laserfiche WebLink
Date Item Number <br />3/1/2026 <br />Reg. O.T. <br />1 10.0 $102.61 $102.61 $1,026.10 <br />2 13.5 $100.07 $100.07 $1,350.95 <br />3 $100.07 $100.07 $0.00 <br />4 $100.07 $100.07 $0.00 <br />5 $100.07 $100.07 $0.00 <br />6 $100.07 $100.07 $0.00 <br />7 $94.82 $94.82 $0.00 <br />8 $66.07 $66.07 $0.00 <br />9 $66.07 $66.07 $0.00 <br />10 20.0 $62.45 $62.45 $1,249.00 <br />11 132.0 $0.00 <br />15% Markup <br />12 $137.12 $0.00 <br />13 $124.46 $0.00 <br />14 13.5 $84.33 $1,138.46 <br />15 $56.10 $0.00 <br />16 $141.60 $0.00 <br />17 $25.32 $0.00 <br />18 $86.80 $0.00 <br />19 49.5 $100.25 $4,962.38 <br />20 82.5 $96.55 $7,965.38 <br />21 10.0 $43.80 $438.00 <br />22 0.0 $47.22 $0.00 <br />15% Markup <br />23 $0.00 <br />24 $0.00 <br />25 $0.00 <br />26 $0.00 <br />27 $0.00 <br />28 $0.00 <br />29 $0.00 <br />30 $0.00 <br />31 $0.00 <br />15% Markup <br />Date Checked By Date <br />$0.00 <br />$0.00 <br />$0.00 <br />Calculated By <br />Total $20,849.79 <br />Materials Subtotal <br />Materials Total <br />Materials <br />1-Ton <br />Equipment Subtotal $14,504.21 <br />$2,175.63 <br />Equipment Total $16,679.84 <br />D6 Dozer <br />Roller <br />Pickup <br />Solo Dump Truck <br />Truck & Pup <br />Tractor & Side Dump <br />138 Excavator <br />Loader <br />Mini Excavator <br />$3,626.05 <br />$543.91 <br />Labor Total $4,169.95 <br />Equipment <br />238 Excavator <br />General Laborer <br />Truck Driver <br />Labor Subtotal <br />Operator (Roller) <br />Pipe Layer <br />Pipe Layer <br />Operator <br />Operator <br />Operator <br />Labor <br />Foreman <br />Operator <br />Operator <br />Time Worked Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />Offhaul Unsuitable <br />Daily Report of Force Account Worked <br />Contract Number Item Name <br />Footing Subexcavation & Structural Fill