Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:27 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 5 <br />Cost Code Notes: <br />Slot:6 <br />Company Note: <br />Indexes: <br />Inspector Note:Excavate spoils out of east building utility closet sleeves that come underneath the footing and sweep up into the utility closet. <br />Date: 02/17/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2545 JESUS LOPEZ 240 2.00 0.00 0.00 <br />1136 JASON TORRES VARGAS 310 2.00 0.00 0.00 <br />BH335 2015 Komatsu PC138 Exc(Yak) 2.00 0.00 0.00 <br />2559 TUCKER SLABACH 210 1.00 0.00 0.00 <br />2559 TUCKER SLABACH 350 1.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 1.00 0.00 0.00 <br />Labor Totals: Hours - 6.0 <br />Equip Totals: Hours - 3.0 <br />Date: 02/18/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2545 JESUS LOPEZ 240 5.00 0.00 0.00 <br />1136 JASON TORRES VARGAS 310 5.00 0.00 0.00 <br />BH335 2015 Komatsu PC138 Exc(Yak) 5.00 0.00 0.00 <br />Labor Totals: Hours - 10.0 <br />Equip Totals: Hours - 5.0