Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:27 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 4 <br />Date: 02/13/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2533 WILLIAM GREEN 350 0.00 1.00 0.00 <br />RLD409 950 Loader 1.00 0.00 0.00 <br />Labor Totals: Hours - 1.0 <br />Equip Totals: Hours - 1.0 <br />Cost Code Notes: <br />Slot:7 <br />Company Note: <br />Indexes: <br />Inspector Note:Export of unsuitable backfill materiel from the east building bathroom 109 feet of conduit trench <br />Date: 02/16/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2533 WILLIAM GREEN 210 1.00 0.00 0.00 <br />FB323 2024 RAM 3500 Flatbed 1.00 0.00 0.00 <br />2541 PARKER BERMAN 310 1.00 0.00 0.00 <br />RBH440 JOHN DEER MINI EXCAVATO 0.50 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 0.50 0.00 0.00 <br />2541 PARKER BERMAN 210 0.50 0.00 0.00 <br />Labor Totals: Hours - 2.5 <br />Equip Totals: Hours - 2.0