My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 10/6/2025 and 3/4/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/04/2026 18:50:26 Page 2 <br />indicates Selection Choice <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot:3 <br />Company Note: <br />Inspector Note:20 ft x 4.6 ft x 2.8ft build of base course build. We were instructed to take the mucky non yielding clay materiel down to a solid base which i <br />case on the upper footing on the stadium arena seating in the southe@st corner had a hefty over excavation to it. With 6 in lifts were installe <br />the same area there was a tapered off of the previously noted build where the over excavation was not as deep with a 20 ft x 4.6ft x 1ft build <br />the case with the builds being so deep the 1 ft perimeter over build was slightly bigger to a 1.5ft on the east side of the footing to account fo <br />sluffing off to create a solid base. <br />12/16/2025 2566 - DYLAN <br />Attached Images/Documents <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot:3 <br />Company Note: <br />Inspector Note:We had to over excavate a 12ft x4'6x 2ft <br />45 ft x 4'6 x 8 in. <br />45 ftx7ftx8 in. <br />And build back up to grade with base course in lifts to ensure compaction density with a non yielding prodding. <br />All over excavated builds are built with a 1 foot over build around the perimeter for a solid base for the footing to be set on. <br />12/16/2025 9091 - NIC LOPEZ <br />Attached Images/Documents <br />12/17/2025 2566 - DYLAN
The URL can be used to link to this page
Your browser does not support the video tag.