Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 10/6/2025 and 3/4/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/04/2026 18:50:26 Page 1 <br />indicates Selection Choice <br />12/02/2025 2566 - DYLAN <br />Attached Images/Documents <br />12/11/2025 2566 - DYLAN <br />Attached Images/Documents <br />12/11/2025 9091 - NIC LOPEZ <br />Attached Images/Documents <br />12/12/2025 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />10.000 TN <br />Slot:4 <br />Company Note: <br />Inspector Note:5x7x9 in depth and a 10x8 x 1 ft over excavation. both on the north east ramp location <br />12/14/2025 2566 - DYLAN <br />Attached Images/Documents <br />12/15/2025 2566 - DYLAN <br />Dealing with adverse weather all week. <br />Parker was absent from work on this day.