My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 10/6/2025 and 3/4/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/04/2026 18:50:27 Page 3 <br />indicates Selection Choice <br />Attached Images/Documents <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot:2 <br />Company Note: <br />Inspector Note:Time for Tony and the loader removing excess dirt and hauling it off as well as bringing in the rock to build up the .75 up with rock <br />9ftx5ftx9in <br />14ftx5ftx9in <br />15ftx5ftx9in <br />10ftx5ftx9in <br />All builds are extended past the footing roughly the one foot extension beyond footing edge for a sold base for the footing per the geo reque <br />12/18/2025 2566 - DYLAN <br />Site was wet and rainy. Time dedicated to ensuring the site was protected. <br />Parker was 30 min late today said his alarm never went off. <br />We also called it a day at 1 pm due to the adverse weather we were getting <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot:2 <br />Company Note: <br />Inspector Note:There was an engineering error on depths on an already dug footing the had already had a .5 over excavation don't in the spread footing <br />location. With was already at the groundwater depth it was a f9.5 footing callout and the depth of bottle. Of footing was 1568.00 which was <br />.75 below the water table. <br />This build was an error on the engineers behalf and really should have been a bottom of footing at 1569.5. <br />This was all built up with base course and compacted in. <br />This task took a hour <br />The other half hour on this days T&M was the amount of time to over excavate the east building continues footing locations in between the <br />spread footings. <br />The continues footing on this building stays about .75 higher then the spread footings. In this separations of elevations between the two b <br />the difference of the spread footings being on a non yielding surface and the continues footing wall being on a yielding surface beyond wha <br />would pass for a stable base. Over excavation is essential into getting our stable non yielding base to build on.
The URL can be used to link to this page
Your browser does not support the video tag.