Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:49:34 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 6 <br />Date: 12/22/2025 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />1192 JOSHUA SAMPSON 210 6.00 0.00 0.00 <br />2566 DYLAN BROWN 810 6.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 5.00 0.00 0.00 <br />Labor Totals: Hours - 12.0 <br />Equip Totals: Hours - 5.0 <br />Cost Code Notes: <br />Slot:2 <br />Company Note: <br />Indexes: <br />Inspector Note:Northside of the east building over excavations and builds <br />11 ftx4ftx.75' <br />24ftx4x.75' <br />18x4x .75' <br />11ftx4ftx.75' <br />West end of the main east building. <br />29ftx7x.75'