Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:49:34 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 7 <br />Date: 12/23/2025 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 350 2.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 2.00 0.00 0.00 <br />1192 JOSHUA SAMPSON 210 3.00 0.00 0.00 <br />2566 DYLAN BROWN 810 3.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 3.00 0.00 0.00 <br />Labor Totals: Hours - 8.0 <br />Equip Totals: Hours - 5.0 <br />Cost Code Notes: <br />Slot:2 <br />Company Note: <br />Indexes: <br />Inspector Note:Over ex builds 2ft wide continues footing around the concession stand. <br />65ftx3.5 ftx 9 in <br />39ft x 3.5x 1.25 in <br />The stairwell footing coming off the east building and onto the south side of the concession stand. <br />5x5x1ft <br />16x7x1ft