Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:49:34 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 4 <br />Date: 12/17/2025 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 350 1.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 1.00 0.00 0.00 <br />1192 JOSHUA SAMPSON 210 3.50 0.00 0.00 <br />2541 PARKER BERMAN 310 3.50 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 0.50 0.00 0.00 <br />BH356 2021 Kubota Exc 3.00 0.00 0.00 <br />2566 DYLAN BROWN 810 3.50 0.00 0.00 <br />Labor Totals: Hours - 11.5 <br />Equip Totals: Hours - 4.5 <br />Cost Code Notes: <br />Slot:2 <br />Company Note: <br />Indexes: <br />Inspector Note:Time for Tony and the loader removing excess dirt and hauling it off as well as bringing in the rock to build up the .75 up with rock <br />9ftx5ftx9in <br />14ftx5ftx9in <br />15ftx5ftx9in <br />10ftx5ftx9in <br />All builds are extended past the footing roughly the one foot extension beyond footing edge for a sold base for the footing per the geo <br />request.