Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:49:34 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 3 <br />Date: 12/16/2025 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 310 1.50 0.00 0.00 <br />BH356 2021 Kubota Exc 1.50 0.00 0.00 <br />2541 PARKER BERMAN 310 3.50 0.00 0.00 <br />BH356 2021 Kubota Exc 3.50 0.00 0.00 <br />2541 PARKER BERMAN 210 0.50 0.00 0.00 <br />1192 JOSHUA SAMPSON 210 4.00 0.00 0.00 <br />Labor Totals: Hours - 9.5 <br />Equip Totals: Hours - 5.0 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MCSBC Base Cr M TN 0.000 52.220 <br />Cost Code Notes: <br />Slot:3 <br />Company Note: <br />Indexes: <br />Inspector Note:We had to over excavate a 12ft x4'6x 2ft <br />45 ft x 4'6 x 8 in. <br />45 ftx7ftx8 in. <br />And build back up to grade with base course in lifts to ensure compaction density with a non yielding prodding. <br />All over excavated builds are built with a 1 foot over build around the perimeter for a solid base for the footing to be set on.