My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name:RFP-08R <br />Project No.4/23/2026 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 40 HR -$106.95 (4,278.00)$ -$ -$ (4,278.00)$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />1" PVC 160 FT -$ -$0.62 (99.20)$ -$ (99.20)$ <br />-$ -$ -$ -$ <br />1" PVC FA 12 EA -$ -$0.91 (10.92)$ -$ (10.92)$ <br />-$ -$ -$ -$ <br />1" Rigid 90 6 EA -$ -$19.29 (115.74)$ -$ (115.74)$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />3/4" Rigid 230 FT -$ -$3.50 (805.00)$ -$ (805.00)$ <br />3/4" Rigid coupling 4 EA -$ -$3.68 (14.72)$ -$ (14.72)$ <br />3/4" Rigid 90 2 EA -$ -$11.40 (22.80)$ -$ (22.80)$ <br />#12 thhn solid 1100 FT -$ -$0.25 (275.00)$ -$ (275.00)$ <br />Bell box 10 EA -$ -$8.95 (89.50)$ -$ (89.50)$ <br />-$ -$ -$ -$ <br />hand hole 1 EA -$ $490.45 490.45$ -$ 490.45$ <br />light pole base 1 EA -$ -$550.00 (550.00)$ -$ (550.00)$ <br />6 (x2) 3 (EX)1 LT -$ -$8,028.00 (8,028.00)$ -$ (8,028.00)$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal (4,278.00)$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />(4,278.00)$ (9,520.43)$ -$ (13,798.43)$ <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />Subtotal Cost of Work <br />Ellensburg Rodeo Arena Improvments RFP 08 <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/RFP-08 scope reduction/Revised/Ellensburg Rodeo Arena RFP-08 scope <br />reduction REVISED Cost Breakdown Issued 4/23/2026
The URL can be used to link to this page
Your browser does not support the video tag.