My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name:RFP-08R <br />Project No.4/23/2026 <br />Description: <br />a.(4,278.00)$ <br />b.-$ <br />c.-$ <br />DIRECT LABOR SUBTOTAL (4,278.00)$ <br />d. <br />e. <br />(4,278.00)$ <br />a.(9,520.43)$ <br />b. <br />(9,520.00)$ <br />a.-$ <br />b. <br />-$ <br />a. <br />-$ <br />(13,798.00)$ <br />a. <br />b.-$ <br />-$ <br />a. <br />b. <br />c. <br />d.-$ <br />-$ <br />a.-$ <br />-$ <br />-$ <br />a.0.15 % of 1 <br />b.0.25 % of 1-7 -$ <br />a.0.03 % of 1-8 -$ <br />(13,798.00)$ <br />CCC <br />Contractor Breakdown Summary <br />McGann Electric <br />freight costs (itemize) <br />2. MATERIAL COSTS <br />Date: <br />Contractor Ref. No. <br />safety (NTE 2% of lines 1a, b, & c) <br />direct supervision (NTE 15% of 1a) <br />Supervision: <br /> 1. CRAFT LABOR COSTS <br />3. EQUIPMENT COSTS <br />NTE 15% portion of 1, 2, 3, & 4 up to $50,000 <br />crew (apprentices, journeymen, & laborers) <br />foreman <br />superintendent <br />Direct Labor Costs: <br />1. CRAFT LABOR COSTS <br />Jack McGann <br />Contractor: <br />Ellensburg Rodeo Arena RFP 08 scope reduction <br />McGann Electric <br /> Source Documents: <br />Eliminate 8 receptacles along fence line, 3 (EX) fixtures, and 6 (X2) fixtures. Add 1 hand hole at future fence line for spare <br />receptacle and lighting conduits. Delete 1 light pole base added per RFP-03. Exclusions: trenching, backfill, pole base <br />installation. <br />Itemize all costs on attached COP Cost Breakdown form. <br />2. MATERIAL COSTS <br />3. EQUIPMENT COSTS <br />4. SMALL TOOLS <br />material costs <br />SUBTOTAL 1 thru 4 <br />7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS <br />owned equipment (per spec approved source) <br />5. OVERHEAD & PROFIT <br />4. SMALL TOOLS <br />rental equipment (per invoices attached) <br />8. INSURANCE <br />5. OVERHEAD & PROFIT <br />6. SUB-SUBCONTRACTORS <br />9. BOND <br />9. BOND <br />small tools (NTE 5% of 1a & b) <br />7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS <br />NTE 15% of Line 6 up to $50,000 for each sub <br />Form Revised 04/25/15 <br />6. SUB-SUBCONTRACTORS <br />TOTAL COST <br />bond <br />payroll driven liability insurance <br />volume driven liability insurance 8. INSURANCE <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/RFP-08 scope <br />reduction/Revised/Ellensburg Rodeo Arena RFP-08 scope reduction REVISED Summary Issued 4/23/2026
The URL can be used to link to this page
Your browser does not support the video tag.