Laserfiche WebLink
RFP #8 - Btc Scope Reduction <br />Item Class Quantity Unit Unit Price <br />1 Material 4.5 CY -$210.75 <br />2 Material 16 EA -$11.86 <br />3 Tools 1 LS -$122.00 <br />4 Ironworker Labor 2 HR -$86.56 <br />5 Cement Mason Labor 8 HR -$65.71 <br />6 Per Diem & Lodging Labor 1 EA -$225.00 <br />-$2,183.94 <br />$0.00 <br />-$2,183.94 <br />Washington <br />Amount (US $) <br />-$189.76 <br />-$948.38 <br />ATTN: General Contractor <br />RFP 8 - Concrete Estimate <br />Estimate Date: 3/29/2026 <br />Project Location <br />Ellensburg, <br />Project <br />Ellensburg Rodeo Improvements <br />Sub Total <br />TOTAL <br />541-861-8060 <br />O&P Markup <br />Jones Concrete & Excavation <br />Estimator - Carson Chester <br />-$173.12 <br />Work Description <br />-$122.00 <br />-$225.00 <br />Ready Mix Concrete - 4500PSI (Includes 10% Spillage) <br />#4 Rebar - Stock 20' Length <br />Screws, Saw Blades, Nails, Bits, Rebar Tie Wire, MAX <br />Rebar Tie Gun, Sprayer, Curing Compound, Form Oil, <br />Impact Gun, Skill Saw, Etc. <br />-$525.68 <br />Customer: <br />Authorized Signature:____________________ <br />Name:___________________________ <br />Date of Acceptance:________________ <br />www.JonesConcrete.pro 1/1