Laserfiche WebLink
RFI 86 -Stage Ramp Wall <br />ATTN: General Contractor <br />RFI#86 Concrete Estimate <br />Estimate Date: 3/20/2026 <br />Project <br />Ellensburg Rodeo Improvements <br />Project Location <br />Ellensburg, <br />Washington <br />Item <br />Work Description <br />Class <br />Quantity <br />Unit <br />Unit Price <br />Amount (US $) <br />1 <br />Ready Mix Concrete - 3000PSI (Includes 30•.6 Spillage) <br />Material <br />2 <br />CY <br />$ 210.75 <br />$ 421.50 <br />2 <br />Ready Mix Concrete - 450OPSI (Includes 10% Spillage) <br />Material <br />1 <br />CY <br />$ 255.75 <br />$ 255.75 <br />3 <br />Rebar, Forms, Form Oil, Curing Compound, Simpson Set 3g Epox <br />Material <br />1 <br />EA <br />$ 482.89 <br />$ 482.89 <br />4 <br />Hydraulic Rebar Bender, Twinmaxx Tie Gun, Rotohammer, <br />TOOIS <br />1 <br />LS <br />$ 231.20 <br />$ 231.20 <br />Rotohammer Drill Bits, Tie Wire, Hot Saw, Hot Saw Blades <br />5 <br />Ironworker <br />Labor <br />6 <br />HR <br />$ 86.56 <br />$ 519.36 <br />6 <br />Carpenter <br />Labor <br />16 <br />HR <br />$ 94.23 <br />$ 1,507.68 <br />7 <br />Cement Mason <br />Labor <br />2 <br />HR <br />$ 65.71 <br />$ 131.42 <br />8 <br />Laborer <br />Labor <br />8 <br />HR <br />$ 62.41 <br />$ 499.28 <br />9 <br />'Per Diem & Lodging <br />Labor <br />4 <br />EA <br />$ 225.00 <br />$ 900.00 <br />Jones Concrete & Excavation <br />Customer: <br />Estimator - Carson Chester <br />Authorized Signature: <br />541-861-8060 <br />Name: <br />Sub Total $ 4,949.08 <br />Date of Acceptance: <br />O&P Markup 15.00% 742.36 <br />TOTAL $ 5,691.44 <br />www.JonesConcrete. pro 1/1 <br />