My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-27-minutes-ec-study-session
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
2026-04-27-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:05:51 PM
Creation date
5/14/2026 12:03:21 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
144485
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFI 77 - Concourse Seating Rebar <br />ATTN: General Contractor <br />RFI 77 - Concrete Estimate <br />Estimate Date: 3/20/2026 <br />Project <br />Ellensburg Rodeo Improvements <br />Project Location <br />Ellensburg, <br />Washington <br />Item <br />Work Description <br />Class <br />Quantity <br />Unit <br />Unit Price <br />Amount (US $) <br />1 <br />Hydraulic Rebar Bender, Twinmaxx Tie Gun, Rotohammer, <br />Misc. <br />1 <br />LS <br />$ 1,384.29 <br />$ 1,384.29 <br />Rotohammer Drill Bits, Tie Wire, Hot Saw, Hot saw Blades <br />2 <br />Simpson Set 3G Epoxy <br />Materials <br />14 <br />EA <br />$ 38.99 <br />$ 545.86 <br />3 <br />#4 Rebar - Stock 20' Length <br />Materials <br />42 <br />EA <br />$ 11.39 <br />$ 478.38 <br />4 <br />Ironworker <br />Labor <br />41 <br />HR <br />$ 86.56 <br />$ 3,548.96 <br />5 <br />Laborer <br />Labor <br />30 <br />HR <br />$ 62.41 <br />$ 1,872.30 <br />6 <br />Per Diem & Lodging <br />Labor <br />9 <br />EA <br />$ 225.00 <br />$ 2,025.00 <br />Includes: <br />170 Drilled & Epoxied #4 Rebar Hooks & Additional #4 Rebar <br />Continious <br />Jones Concrete & Excavation <br />Customer: <br />Estimator - Carson Chester <br />Authorized Signature: <br />541-861-8060 <br />Name: <br />Sub Total $ 9,854.79 <br />Date of Acceptance: <br />0&P Markup 15.00% 1,478.22 <br />_ <br />TOTAL $ 11,333.01 <br />1/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.