My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-078
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
R2026-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 12:45:40 PM
Creation date
5/12/2026 12:44:08 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location G: Summit EastArea <br />Area Limits Hyak Drive E: SR 906 to Keechelus Drive <br />Jurisdiction Kittitas County <br />Land Use Context Summit East, downhill skiing, vacation rentals <br />Speed Limit Hyak Drive E: 2O mph, Snoqualmie Drive: 35 mph <br />AADT Not available <br />Proposed Cou ntermeasures <br />A series of countermeasures were selected for the Hyak Drive East from SR 906 <br />to Keechelus Drive to address both collision-related and non-collision-related <br />concerns, as illustrated in Figure 34. ltems in bold are FHWA Proven Safety <br />Countermeasures. <br />Cost Estimates <br />Approximate planning-level costs for each countermeasure are outlined below: <br />Table 9. Location G - Cost Estimates of Proposed Countermeasures <br />Kittitas County I Snoqualmie Pass Comprehensive Safety Plan 62 <br />Collision History <br />Between 2Ot4 and 2023, there were eight reported collisions in this priority <br />area. Of these eight collisions, four collisions were intersection-related. Three <br />collisions resulted in a possible or minor injury and all were vehicle-only <br />collisions. <br />3 Possible or minor <br />collisions <br />Of the 8 collisions: <br />All <br />Access Management <br />Sidewalks <br />Roadway Reconfi guration <br />Systematic Application of Multiple <br />Low-Cost Countermeasures at <br />Stop-Controlled I ntersections <br />Mini-Roundabout <br />Crosswalk <br />RRFB <br />lntersection t9% <br />4 *,,,",or," <br />Were intersection- <br />related <br />. School busstop atthe <br />intersection of Hyak Drive <br />E & Snoqualmie Drive. <br />. lntersection confusion due <br />to signs that are out of sight, <br />unclear pavement markings, <br />and size of intersection. <br />. Overflow from private parking <br />lots onto Hyak Drive E. <br />Were vehicle- <br />only collisions. <br />. Vehicle and pedestrian conflicts <br />for access to Summit East. For <br />example, private parking lots are <br />divided by Hyak Drive E, resulting <br />in pedestrians walking down the <br />roadway to access the ski area. <br />. High speeds along Hyak Drive E. <br />Corridor <br />Corridor <br />Corridor <br />lntersection <br />Crossing <br />Crossing <br />Not available <br />65-89% <br />Not available <br />82% <br />40% <br />47% <br />$$ <br />$$ <br />$ <br />Non-Collision Concerns <br />Additional concerns were identified in this area through public comments, <br />stakeholder feedback, and observation by the County and consultants. <br />Concerns include: <br />$ <br />$$$ <br />$ <br />$$ <br />Source: SCJ, 2025. <br />It is important to note that due to snow-plow activity within the Snoqualmie <br />Pass area, recessed plastic pavement markings are recommended for <br />channelization. Sufficient budget must be allocated for renewing pavement <br />markings for the proposed solutions to be effective. <br />' AADT information is not available for local County roads. <br />t CRF5 are approximated based on the data provided by the FHWA Proven Safety Countermeasures. <br />+ Costs are based on a preliminary engineer's estimate of magnitude. <br />38o/ot F el:,,t'::"*;ei:-.'?';..is "rl:as <br />Application Crash reduction <br />factort <br />Cost <br />level+Countermeasure
The URL can be used to link to this page
Your browser does not support the video tag.