My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-078
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
R2026-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 12:45:40 PM
Creation date
5/12/2026 12:44:08 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intersection of SR 9O6 I TannerWay <br />lmplement corridor access management to improve <br />traffic flow into and out of private parking lots. By <br />defining entrances and exits, roadway users can know <br />where to expect cars to be. <br />lntersection lmprcvement <br />Intersection of SR 906 €d TannerWay <br />lnstall reflective crosswalk markings (such as bar <br />pairs, continental, or ladder) to act as crosswalk <br />visibility enhancements to reduce conflicts between <br />pedestrians and drivers, as the curvature of the <br />roadway reduces the visibility at the crossing location. <br />lnstall pedestrian-scale lighting in advance of the <br />crossing^ <br />lnstall a Rectangular Rapid Flashing Beacon (RRFB) to <br />provide advanced warning of the crossing location and <br />make drivers aware of pedestrians within the crossing. <br />Crossing Treatment <br />SPEED <br />LIMIT <br />25 <br />Corridor lmprovement <br />SR 9O6,West of Intersectionwith <br />Tanner Way to Summit Central <br />Add a shared use path to provide non-motorized <br />transportation alternatives. This aligns with the <br />walkway and bicycle lane FHWA proven safety <br />countermeasures and provides pedestrians and <br />cyclists with a dedicated space that reduces their <br />interactions with vehicles. <br />. Connect the intersection of 5R 906 & <br />Tanner Way to Summit Central (0.6 miles). <br />. Provide local non-motorized trail connectivity <br />between Alpental and Lake Keechelus. <br />Reduce the speed limit to reflect appropriate <br />speeds for a revised roadway section.
The URL can be used to link to this page
Your browser does not support the video tag.